County of Harris (TX)
NEC Code Version2020
SolarAPP+ StatusTargeted
Wet Stamps RequiredNone
Fire Setback Enforced0
Codes
- NEC Code Version
- 2020
- Code List
2018 INTERNATIONAL BUILDING CODE
2018 INTERNATIONAL FIRE CODE
2015 INTERNATIONAL MECHANICAL CODE
2015 INTERNATIONAL PLUMBING CODE
2015 INTERNATIONAL FIRE CODE
2014 NFPA 70
2020 NATIONAL ELECTRIC CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- Revision Required
- 0
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- None
- Structural Calculations Required
- No
- Stamp Location On Plans
- N/A
- Date On Stamps
- N/A
Fire setbacks
- Fire Setback Enforced
- 0
- Setback Notes
NO FSB needed in this AHJ as we do not need a solar permit to install
Structural & loads
- Wind Speed
- 142
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
- Confirm in HOA db if stamps are required for the project. AHJ does not require stamps.
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- No
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,PV Breaker,Meter Adapter,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Must have a generation disconnect for combined ESS, or a single disconnect per generation source.
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
- Electrical Diagram
Standard
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- No
- Ground Mount Notes
- No earth anchoring systems due to marshy soil.
- No Nuance Racking. IronRidge Only.