City of Tyler (TX)

Texas Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2021 INTERNATIONAL RESIDENTIAL CODE

2021 INTERNATIONAL BUILDING CODE

2021 INTERNATIONAL ENERGY CONSERVATION CODE

2021 INTERNATIONAL MECHANICAL CODE

2021 INTERNATIONAL PLUMBING CODE

2021 INTERNATIONAL FUEL GAS CODE

2023 NATIONAL ELECTRICAL CODE

2021 EXISTING BUILDING CODE

2021 INTERNATIONAL FIRE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
115
Wind Notes

Exposure Category B

Snow Load
5
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

per correction on a past project, structural calcs & stamps are required

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
PV Breaker,Meter Adapter,Line Side Taps,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

AHJ needs to see that Modules are parallel to roof slope. They call this out when the eco fasten mounting system is being used on PV_4 because a side view is not provided

Attachment Detail

Show that the panel is parallel to the roof slope. OR add note, " ** _Modules will be installed parallel to existing roof slope"_** _(In house template already does this. Outsourced plans will need this added)_

Electrical Diagram

Standard

Custom Placards Required
1
Placards Notes

The city will require Placards for all installs at time of inspection. They will fail inspection without placard installed

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Tyler (TX) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.