City of Tyler (TX)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2021 INTERNATIONAL RESIDENTIAL CODE
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL PLUMBING CODE
2021 INTERNATIONAL FUEL GAS CODE
2023 NATIONAL ELECTRICAL CODE
2021 EXISTING BUILDING CODE
2021 INTERNATIONAL FIRE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category B
- Snow Load
- 5
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
per correction on a past project, structural calcs & stamps are required
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Meter Adapter,Line Side Taps,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
AHJ needs to see that Modules are parallel to roof slope. They call this out when the eco fasten mounting system is being used on PV_4 because a side view is not provided
- Attachment Detail
Show that the panel is parallel to the roof slope. OR add note, " ** _Modules will be installed parallel to existing roof slope"_** _(In house template already does this. Outsourced plans will need this added)_
- Electrical Diagram
Standard
- Custom Placards Required
- 1
- Placards Notes
The city will require Placards for all installs at time of inspection. They will fail inspection without placard installed
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim