City of McKinney (TX)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2024 INTERNATIONAL RESIDENTIAL CODE
2024 INTERNATIONAL PLUMBING CODE
2024 INTERNATIONAL MECHANICAL CODE
2024 INTERNATIONAL FUEL GAS CODE
2024 INTERNATIONAL ENERGY CONSERVATION CODE
2024 INTERNATIONAL PROPERTY MAINTENANCE CODE
2024 INTERNATIONAL SWIMMING POOL SPA CODE
2024 INTERNATIONAL FIRE CODE
2023 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- Revision Required
- 1
- Rough Inspection
- Rough Electrical
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Ee Stamp Notes
EE should stamp conductor calcs page, if applicable
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category B
- Snow Load
- 5
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
- SE & EE digital stamps on all PV pages, PE Letter & Calcs.
- Structural letter MUST state "that the building is structurally adequate to support the installation of the proposed PV installation"
- Please ensure the Planset AND Structural Calcs/Letter reflect 2024 with NEC2023
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,PV Breaker,Line Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- No
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Plans must include spec sheets for any jbox, disconnect, and combiner box used on the job
Provide the UL listing/labeling or a Certificate of compliance from one of the nationally recognized testing laboratories (NRTLs) with the exact model number of the product highlighted on the certificate. These can be obtained via the link below.
https://iq.ulprospector.com/en
Please ensure the Eaton Disconnect document within the files section is slipped into the planset.
Please ensure the Planset AND Structural Calcs/Letter reflect 2024 with NEC2023
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- No