City of Mansfield (TX)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2023 NATIONAL ELECTRICAL CODE
2018 INTERNATIONAL BUILDING CODE
2018 INTERNATIONAL ENERGY CONSERVATION CODE
2018 INTERNATIONAL EXISTING BUILDING CODE
2018 INTERNATIONAL FIRE CODE
2018 INTERNATIONAL FUEL GAS CODE
2018 INTERNATIONAL MECHANICAL CODE
2018 INTERNATIONAL PLUMBING CODE
2018 INTERNATIONAL PROPERTY MAINTENANCE CODE
2018 INTERNATIONAL RESIDENTIAL CODE
2018 INTERNATIONAL SWIMMING POOL AND SPA CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 1
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Ee Stamp Notes
- Stamp Location On Plans
- Center
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category B
- Snow Load
- 5
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Pages 1-7 must have space in upper right hand corner of plans required exactly like city of Dallas. Make sure engineer does not put the stamp in that space.
(2018 Code) ASCE 7-16 106 mph wind speed is the equivalent to (2015 Code) ASCE 7-10 115 MPH
Structural Engineer Letter must include the 2023 NEC code.
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,Meter Adapter,Line Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
equipment shall be behind the house and screened OR it can be wall-mounted next to the electric meter.
- staff -
all projects require EE stamp on SLD.
24 x36 paper format required (To be completed by Designer ll)
In pdf: Page Setup > size > ARCH D
Please leave a w: 2 x h: 6 clear space at the top right corner of your 24 x 36 drawing sheets.
The City of Mansfield will use that space to accommodate the approval batch stamps. The space should start at 1.5 from the top and 4.5 from the right side.
solar panels are not allowed to be faced on a roof slope that faces a public street. State law now requires AHJs to allow this.
The racking certification letter must call out the basic wind speed as (115-180) or greater
- Electrical Diagram
Standard
- Custom Placards Required
- 0
- Non Standard Planset Requirements
- Single Line Diagram
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim