City of Grand Prairie (TX)

Texas Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2021 INTERNATIONAL RESIDENTIAL CODE

2021 INTERNATIONAL PLUMBING CODE

2021 INTERNATIONAL MECHANICAL CODE

2021 INTERNATIONAL ENERGY CODE

2021 INTERNATIONAL FIRE CODE

2021 INTERNATIONAL FUEL & GAS CODE

2023 NATIONAL ELECTRIC CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
Other (See Submission Notes)
Revision Required
1
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Digital Structural,Digital Electrical
Structural Calculations Required
Yes
Ee Stamp Notes

Electrical engineering stamps now required per correction 10/11.

Stamp Location On Plans
Unspecified
Date On Stamps
Date Plans are Stamped

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
115
Snow Load
5
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

PE Instructions: SE / EE digital stamps on all PV pages. Digital stamped PE Letter / Calcs required. PE Stamps need to indicate the date stamped/signed. PE letters / Structural calcs need to indicate 2021 IBC & 2021 IRC ONLY. AHJ requests a cover letter as well similar to City of Houston projects.

Minimum Ground On Roof
#10

Electrical

AC Disconnect Required
Yes
Electrical Load Calcs Required
Derates,Taps
Allowed POI
Meter Adapter,PV Breaker,Line Side Taps,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96
BOS Restrictions

Heavy electrical equipment shall not be attached on bricks/veneer May require inverter in garage for some projects

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
No
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

TAPS: .AHJ is only Accepting Polaris IT-350

Cover Page Notes


Site

Show with dashed lines the 4ft perimeter around the structure and label it: “Maintain 4ft clear perimeter pathway around the building" 2021 IFC: [Sec 1205.3.1]

Attachment Detail


Attachment Detail Notes

Roof Mount [Heavy Electrical equipment shall NOT be attached on Bricks/Veneer or any non-load bearing surface. Equipment to be installed per manufacturers spec, and attached to load bearing framing members.]

Electrical Diagram

TAPS

  • When performing LST we must use IT-350's
  • The City of Grand Prairie will not accept any Buchannan B-Tap Connector information. Please do not supply this information in the plan set. Please delete pages 18-21 of the final published plans.


When calling out a line side tap one of the two following builds should be designed, based on the as-built conditions:


1. Meter can ONLY outside (readily accessible):

  • (N) non fusible disconnect outside next to meter to serve as the emergency disconnect (NEC 2020: 230.85) .
  • Show two port lugs on the line in side of the disconnect with the inverter/combined inverters output terminated on the second port (first port tied to the utility supply).
  • Include all subsequent parts in BOM.


2. Meter can AND disconnect located outside (readily accessible):

  • Perform a Hoffman/tap box tap at the existing disconnect.
  • Indicate on single line that the tap connecters used are Polaris IT-350 and clearly show tap in the junction box NOT the disconnect.
  • Include the confirmation letter linked here in the permit set
  • Include all subsequent parts in the BOM
Electrical Diagram Notes

LST [LINESIDE TAP WILL BE PERFORMED VIA UL LISTED POLARIS IT SERIES MODEL: IT-350]

Custom Placards Required
0
Non Standard Planset Requirements
Single Line Diagram

Ground mount

Ground Mount Fencing Required
No
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Grand Prairie (TX) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.