City of Euless (TX)
NEC Code Version2020
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced1
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2021 INTERNATIONAL BUILDING CODE WITH AMENDMENTS
2021 INTERNATIONAL FIRE CODE WITH AMENDMENTS
2021 INTERNATIONAL MECHANICAL CODE WITH AMENDMENTS
2021 INTERNATIONAL PLUMBING CODE WITH AMENDMENTS
2021 INTERNATIONAL ENERGY CONVERSATION CODE WITH AMENDMENTS
2021 INTERNATIONAL FUEL GAS CODE WITH AMENDMENTS
2021 INTERNATIONAL RESIDENTIAL CODE WITH AMENDMENTS
2020 NATIONAL ELECTRIC CODE WITH AMENDMENTS
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 1
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category B
- Snow Load
- 5
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
06/25 DL - PE letter and Structural Calcs required. [a past project. DCR 051921] SE digital stamps on corresponding PV pages & PE Letter / Calcs. WS: 115 MPH, Exposure Cat. B, GSL: 5 LBS
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,Load Side Taps,Line Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- Yes
Plan set
- Plan Set Requirements
PE letter and Structural Calcs required.
- Electrical Diagram
Standard
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim