Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Bells (TX)

Texas Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2020
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2020
Fire Code Version
2018 Building Code
Code List
BUILDING CODES A permit is required prior to the commencement of any construction located on property within the City limits. Activities requiring permits are listed below: ๏ 2012 International Building Code ๏ 2012 International Residential Code for One and Two-Family Dwellings ๏ 2012 International Mechanical Code ๏ 2012 International Plumbing Code ๏ 2012 International Fire Code ๏ 2012 International Fuel Gas Code ๏ 2012 International Energy Conservation Code ๏ 2012 International Property Maintenance Code ๏ 2011 National Electrical Code (with local amendments) These codes can be purchased in their entirety through the International Code Council.
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

Revision Required
0
New Planset Required For Module Swap
0

Stamps

Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes
Standard

Structural & loads

Wind Speed
90
Snow Load
5
Reducible Snow Load Allowed
1
Minimum Ground On Roof
#10

Electrical

Allowed POI
Load Side Taps,Line Side Taps,PV Breaker,Meter Adapter
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes
Standard

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Bells (TX) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.