City of Aledo (TX)
Codes
- NEC Code Version
- 2014
- Fire Code Version
- 2015 Building Code
- Code List
2015 International Residential Code
2015 International Plumbing Code
2015 International Mechanical Code
2015 Energy Conservation Code
2015 International Fire Code
2015 International Fuel Gas Code
2014 National Electrical Code
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 2
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
* 2012 IFC
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category B
- Snow Load
- 5
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,PV Breaker,Line Side Taps,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Site
## **Site:** _include the PV array layout in compliance with the local government design criteria including:_ * Roof plan showing location of equipment and, if required, fire setbacks * Existing site easements, property lines, building setback lines, zoning setbacks * Typical side view detail of the solar PV system mount on the roof * Location of all existing structure and proposal PV system equipment ( _including modules, disconnections, inverters, panel boards, combiner boxes, storage batteries, utility meters, etc.)_ * Plumbing vent termination: Vent termination is _not allowed_ under solar installations and must be relocated or modified, or an air admittance valve may be utilized in accordance with the IPC and/or IRC
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim