Town of Lincoln (RI)
NEC Code Version2017
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced1
Codes
- NEC Code Version
- 2017
- Fire Code Version
- 2018 Building Code
- Code List
2021 RHODE ISLAND BUILDING CODE
2021 RHODE ISLAND RESIDENTIAL CODE
2021 RHODE ISLAND FIRE CODE
2021 RHODE ISLAND PLUMBING CODE
2021 RHODE ISLAND MECHANICAL CODE
2021 RHODE ISLAND ENERGY CODE
2021 RHODE ISLAND ADMINISTRATIVE CODE
2021 RHODE ISLAND ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 1
- Revision Required
- 0
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Ee Stamp Notes
SE / EE digital stamps on all PV pages 1-7a & PE Letters / Calcs.
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 130
- Wind Notes
Exposure Category C. Wind-borne debris region.
- Snow Load
- 40
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- All Jobs
- Allowed POI
- Line Side Taps,PV Breaker,Meter Adapter,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 1
- BOS Restrictions
Inspector won't allow taps and/or CTs inside main breaker disconnects going forward. Tap box is preferred.
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
- When multiple projects are being installed on the same site, a combined master plan set showing both systems will be required.
- AHJ requires a masterplan set for sister projects. (both layouts on one master planset)
- Electrical Diagram
- Electrical load calcs must be provided showing the system will not produce more than 125% of the property load
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim