City of Providence (RI)
NEC Code Version2017
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced1
Codes
- NEC Code Version
- 2017
- Fire Code Version
- 2018 Building Code
- Code List
2021 RHODE ISLAND BUILDING CODE
2021 RHODE ISLAND RESIDENTIAL CODE
2021 RHODE ISLAND FIRE CODE
2021 RHODE ISLAND PLUMBING CODE
2021 RHODE ISLAND MECHANICAL CODE
2021 RHODE ISLAND ENERGY CODE
2021 RHODE ISLAND ADMINISTRATIVE CODE
2021 RHODE ISLAND ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 1
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 1
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 135
- Wind Notes
Exposure Category C. Wind-borne debris region.
- Snow Load
- 35
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
- Use 2021 RISBC-1/RISBC-2 with RI amendments
- Any RI project sized over 15Kw is required to have the engineer fill out and sign/stamp a 128 Form.
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,Meter Adapter,Load Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 1
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
- Provide the fire classification of the rooftop-mounted photovoltaic panel system
- Jobs with more than 1 system sold on a property must be drawn all together as 1 plan.
- Electrical Diagram
If Production Meter required needed to be labeled "(N) Production Meter Customer Owned"
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim