County of Jackson (OR)
Codes
- NEC Code Version
- 2023
- Code List
2021 OREGON RESIDENTIAL SPECIALTY CODE
2019 OREGON STRUCTURAL SPECIALTY CODE
2019 OREGON MECHANICAL SPECIALTY CODE
2021 OREGON PLUMBING SPECIALTY CODE
2023 OREGON ELECTRICAL SPECIALTY CODE AMENDMENTS
2025 OREGON ENERGY EFFICIENCY SPECIALTY CODE
2019 OREGON ZERO ENERGY READY COMMERCIAL CODE
2019 OREGON FIRE CODE
2010 OREGON MANUFACTURED DWELLING INSTALLATION SPECIALTY CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
Fire setbacks
- Fire Setback Enforced
- 0
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 999
- Snow Load
- 999
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 48
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,PV Breaker,Meter Adapter,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
**** ALL manufactured homes, pole buildings, flat roofs, and framing under 2x4 will need stamps, pe letter, and structural calcs.
PLEASE ENSURE THE ABOVE NOTE IS FOLLOWED
#NFZ_ALL
- Attachment Detail
Attachments shall be spaced not greater than 24 inches (609.6 mm) on center in any direction where: * Ground snow loads (https://up.codes/viewer/oregon/ibc-2018/chapter/2/definitions#loads_455.715_definitions_for_ors_455.715_to_455.740) exceed 36 psf (1.197 kN/m2). * Located within 3 feet (914 mm) of a roof edge, hip, eave or ridge. * Located in wind Exposure Category B or greater and the _wind speed_ exceeds 120 mph. * Located in wind Exposure Category C or greater and the _wind speed_ exceeds 110 mph.
- Custom Placards Required
- 0
- Non Standard Revision Requirements
ALL manufactured homes, pole buildings, flat roofs, and framing under 2x4 will need stamps, pe letter, and structural calcs.
PLEASE ENSURE THE ABOVE NOTE IS FOLLOWED
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim
- Ground Mount Notes
website for septic research: https://www.oregon.gov/deq/Pages/index.aspx