City of Sherwood (OR)
NEC Code Version2023
Fire Setback Enforced0
Codes
- NEC Code Version
- 2023
- Code List
2023 OREGON ELECTRICAL SPECIALTY CODE
2025 OREGON ENERGY EFFICIENCY SPECIALTY CODE
2019 OREGON MECHANICAL SPECIALTY CODE
2019 OREGON STRUCTURAL SPECIALTY CODE
2021 OREGON RESIDENTIAL SPECIALTY CODE
2021 OREGON PLUMBING SPECIALTY CODE
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 1
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Structural Calculations Required
- No
Fire setbacks
- Fire Setback Enforced
- 0
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 999
- Wind Notes
Wind speed values should be references via https://ascehazardtool.org/
- Snow Load
- 999
- Snow Load Notes
Snow load values should be references via https://ascehazardtool.org/
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 48
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Meter Adapter,Load Side Taps,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Attachment Detail
Attachment spacing shall not be greater than 24" when
- Snow load exceeds 36 PSF
- The home is located within wind exposure category B, and the wind speed exceeds 120 mph
- The home is located within wind exposure category C, and the wind speed exceeds 110 mph.
- Modules will be located within 3' of a roof edge, hip, eave, or ridge
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim