Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Salem (OR)

Oregon Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2015 Building Code
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2015 Building Code
Code List

2023 OREGON RESIDENTIAL SPECIALTY CODE

2023 OREGON ELECTRICAL SPECIALTY CODE

2025 OREGON ENERGY EFFICIENCY SPECIALTY CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
Other (See Submission Notes)
Revision Required
1
New Planset Required For Module Swap
1

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Please Complete the Oregon Fire Setback Checklist before you complete your aurora design.

All solar roof planes MUST have 36โ€ pathways along 3 sides of the roof plane. Pathways cannot be over unsupported areas like overhangs and eaves - Pathways must start from the load bearing wall. The following exceptions below allow us to avoid having 3 pathways on each plane:

  1. Total array area is not greater than 1,000 sqft and it has an intersecting adjacent roof plane free of solar panels.
  • If #1 applies AND total array area does not exceed 25% of roof area that the array is on, then one 12โ€ pathway is required along each side of the horizontal ridge.
  • If #1 applies AND the total array area exceeds 25% of total roof area that the array is on, then one 12โ€ pathway is required song each side of the horizontal ridge AND one 36โ€ pathway from ridge to eave shall be provided.

Pathways are not required on non-occupied accessory structures, provided that they are separated from occupied structures by not less than 60 inches or by a minimum two-hour fire-rated assembly. When using this exception, please include a dimension of the shortest distance between the array building and the nearest occupied structure.

Pathways are not allowed within 12" of low point valleys.

Pathways cannot straddle ridges/hips

Additional information and examples of acceptable fire setbacks can be found in the files below.

Structural & loads

Wind Speed
120
Wind Notes


Snow Load
25
Reducible Snow Load Allowed
0
Max Attachment Spacing
48
Structural Notes
  • Manufactured homes
  • Flat Roofs
  • Barns
  • If homes needs structural upgrades

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,Load Side Taps,PV Breaker,Line Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

#NFZ_ALL#

Complete the "OR PV Checklist" from the files below to determine if PE is required. If we can follow the prescriptive path in the checklist, no PE is needed.

Cover Page

Please specify design criteria utilized on the plans as well. Design criteria should include exposure category, snow load, basic wind speed, etc.

Roof Plan

Cannot show setbacks along valleys or within 1' of valleys

Non Standard Revision Requirements

Change letters will always be required and they will need to be on a 11x17 page format.

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Salem (OR) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.