City of Ontario (OR)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2023 NATIONAL ELECTRICAL CODE
2023 OREGON RESIDENTIAL SPECIALTY CODE
2025 OREGON ELECTRICAL SPECIALTY CODE
2022 OREGON STRUCTURAL SPECIALTY CODE
2022 OREGON FIRE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Not accepted
- Any SolarAPP+ Restrictions
- 0
- How Many Plansets Required
- 2
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Access pathways need to be located over structurally supported area. Roof overhangs area typically not located on structurally supported areas. 3 sides of 3โ of access around the solar panel system from the street or front side of the house. That includes the 3โ on the sides and 18โ on each side of the ridge. Also if it is more than 150โ in length it will need some mid access
we can no longer start the fire setbacks from the edge of the roof if there is an eave, but if there is no eave we are good to start at the edge. The City of Ontario is stating that the "eave is an unsupported area of the roof and cannot be used as a fire setback" so will have to start designing the fire setbacks from the support wall.
Structural & loads
- Wind Speed
- 105
- Wind Notes
Wind exposure category C
- Snow Load
- 999
- Snow Load Notes
Roof: 25 Ground: 36
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 48
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,Meter Adapter,PV Breaker,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
OR Prescriptive checklist required
- Cover Page Notes
All Jobs [Ground snow load of 36 psf, Roof snow load of 25 psf. Wind speed: 105MPH. Wind Exposure Category C]
- Attachment Detail
Attachments shall not be spaced greater than 24 inches (609.6 mm) on center in any direction where:
- Ground snow loads exceed 36 psf (1.197 kN/m2).
- Located within 3 feet (914 mm) of a roof edge, hip, eave, or ridge.
- Located in wind Exposure Category B or greater, and the wind speed exceeds 120 mph.
- Located in wind Exposure Category C or greater, and the wind speed exceeds 110 mph.
- Custom Placards Required
- 0
- Non Standard Revision Requirements
Prescriptive Rooftop Mounted Solar Installation Checklist needs to be filled out and uploaded along with plan completion
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim