City of Lafayette (OR)
Codes
- NEC Code Version
- 2023
- Code List
2023 OREGON RESIDENTIAL SPECIALTY CODE
2023 OREGON STRUCTURAL SPECIALTY CODE
2023 OREGON MECHANICAL SPECIALTY CODE
2023 OREGON PLUMBING SPECIALTY CODE
2023 OREGON ELECTRICAL SPECIALTY CODE
2025 OREGON ENERGY EFFICIENCY SPECIALTY CODE
2023 OREGON ZERO ENERGY READY COMMERCIAL CODE
2023 OREGON FIRE CODE
2023 OREGON MANUFACTURED DWELLING INSTALLATION SPECIALTY CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 2
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Fire setbacks
- Fire Setback Enforced
- 0
- Setback Notes
- Standard
Structural & loads
- Wind Speed
- 999
- Snow Load
- 999
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 48
- Structural Notes
- AHJ requires engineer stamps on plans as well as engineer letter/calculations.
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,PV Breaker,Load Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
- Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Site
1\. The property owner’s name and phone number, the property’s legal description, subdivision name and the site address. 2. The map scale. A scale of 1”= 20’ is typical but others, 1/8”=1’ for example, are also acceptable. 3\. A north arrow, indicating the direction north. 4\. All property lines, all easements (utilities, access, etc.) and site dimensions. Show the distances between buildings, and from building to all property lines. 5\. All streets and alleys, with street names. Show all existing and/or proposed driveway widths and sidewalks. 6\. Identify each building by its use (garage, residence, etc.). Include decks, retaining walls, and the like. 7\. Show clear distinction between the existing buildings and driveway and any proposed additions/changes. Also show any building to be demolished. 8\. Show all utilities, hydrant, trees, water meters, catch basins, sewer laterals, transformers and any other above ground utilities. 9\. Show method of rainwater r disposal including roof run-off and slopes of large paved areas to approved storm drain system (drywell can be used in some cases). 10\. Show any steep slopes on or near lot that exceed a 2:1 slope (2 feet rise in 1 horizontal foot) lot. 11. Show street tree placement. The plan must show lot and building dimensions; setbacks; location of easements and driveway; footprint of structure(s) (including decks); location of water/sewer systems; utility locations; direction indicator; lot area; building coverage area; percentage of coverage; existing structures on site; and surface drainage
- Attachment Detail
Attachments shall be spaced not greater than 24 inches (609.6 mm) on center in any direction where:
- Ground snow loads exceed 36 psf (1.197 kN/m2).
- Located within 3 feet (914 mm) of a roof edge, hip, eave or ridge.
- Located in wind Exposure Category B or greater and the wind speed exceeds 120 mph.
- Located in wind Exposure Category C or greater and the wind speed exceeds 110 mph.
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim