Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Joseph (OR)

Oregon Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023

Codes

NEC Code Version
2023
Code List

2021 OREGON RESIDENTIAL SPECIALTY CODE

2019 OREGON STRUCTURAL SPECIALTY CODE

2019 OREGON MECHANICAL SPECIALTY CODE

2021 OREGON PLUMBING SPECIALTY CODE

2023 OREGON ELECTRICAL SPECIALTY CODE

2025 OREGON ENERGY EFFICIENCY SPECIALTY CODE

2019 OREGON ZERO ENERGY READY COMMERCIAL CODE

2019 OREGON FIRE CODE

2010 OREGON MANUFACTURED DWELLING INSTALLATION SPECIALTY CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

Revision Required
0
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Structural Calculations Required
No

Structural & loads

Reducible Snow Load Allowed
1

Electrical

AC Disconnect Required
No
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Joseph (OR) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.