City of Astoria (OR)
NEC Code Version2023
Fire Code Version2018 Building Code
Wet Stamps RequiredNone
Fire Setback Enforced1
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2021 OREGON RESIDENTIAL SPECIALTY CODE
2019 OREGON STRUCTURAL SPECIALTY CODE
2019 OREGON MECHANICAL SPECIALTY CODE
2021 OREGON PLUMBING SPECIALTY CODE
2023 OREGON ELECTRICAL SPECIALTY CODE
2025 OREGON ENERGY EFFICIENCY SPECIALTY CODE
2019 OREGON ZERO ENERGY READY COMMERCIAL CODE
2019 OREGON FIRE CODE
2010 OREGON MANUFACTURED DWELLING INSTALLATION SPECIALTY CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 1
- New Planset Required For Module Swap
- 1
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- None
- Structural Calculations Required
- No
Fire setbacks
- Fire Setback Enforced
- 1
Structural & loads
- Wind Speed
- 999
- Snow Load
- 999
- Reducible Snow Load Allowed
- 1
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Meter Adapter,Load Side Taps,Line Side Taps
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
- BOS Restrictions
Standard
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Standard
- Cover Page
Standard
- Site
Standard
- Roof Plan
Standard
- Attachment Detail
Standard
- Electrical Diagram
Standard
- Label Page
Standard
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim
- Ground Mount Notes
Erosion control study required on 30 degrees or more
- Ground Mount Requires Soil Sample
- Environmental Study
- Setback Front Yard
- 5
- Setback Back Yard
- 5
- Setback Side Yard
- 5