Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Marysville (OH)

Ohio Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Code List

2024 OHIO BUILDING CODE (2021 IBC)

2019 RESIDENTIAL CODE OF OHIO (2018 IRC)

2024 OHIO EXISTING BUILDING CODE (2021 IEBC)

2023 OHIO ELECTRIC CODE (2023 NFPA 70)

2021 INTERNATIONAL FIRE CODE (IFC)

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

Revision Required
0
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Shall be installed on the plane of the roof (flush mounted) or made part of the roof design and shall not extend above the ridgeline of the roof or extend beyond the existing roof width. In no instance shall the system extend greater than 18 inches from the roofs surface.

Structural & loads

Wind Speed
90
Snow Load
20
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,Line Side Taps,Load Side Taps,PV Breaker
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Roof Plan Notes

All exposed conduits, plumbing lines and related appurtenances shall be painted a color that closely matches the roof materials.

Electrical Diagram

Projects that have a SolarEdge inverter do NOT require a J-Box

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Ground Mount Notes

Any portion of the structure shall not exceed a maximum of 6 feet in height. All conduits, plumbing lines and related appurtenances shall be located underground.

Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Marysville (OH) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.