City of Columbus (OH)

Ohio Authority Having Jurisdiction Solar permitting requirements

Spot something wrong?

These change with code cycles. If a requirement here is out of date or missing, tell us and we'll fix it.

Report a correction
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback EnforcedYes

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2024 OHIO BUILDING CODE (2021 IBC)

2019 RESIDENTIAL CODE OF OHIO (2018 IRC)

2024 OHIO EXISTING BUILDING CODE (2021 IEBC)

2023 OHIO ELECTRIC CODE (2023 NFPA 70)

2021 INTERNATIONAL FIRE CODE (IFC)

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
Yes
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
Other (See Submission Notes)
Revision Required
Yes
Rough Inspection
None
New Planset Required For Module Swap
No

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Digital Structural,Digital Electrical
Structural Calculations Required
Yes
Ee Stamp Notes
  • AHJ Requires stamps by an Ohio Design professional
  • EE stamp required on three line diagram and electrical calculations
Stamp Location On Plans
Top Right
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
Yes
Setback Notes

Standard

Structural & loads

Wind Speed
107
Wind Notes

Wind Speed: 107 mph

Snow Load
20
Reducible Snow Load Allowed
No
Max Attachment Spacing
96
Structural Notes

Plans must be locked

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Load Side Taps,Line Side Taps,PV Breaker,Meter Adapter
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
No
ESS Notes

Standard

Separate ESS Disconnect Required
No
ESS Elevation Detail Required
No

Plan set

Electrical Diagram

SolarEdge inverter do NOT require a J-Box

Electrical Diagram Notes


Custom Placards Required
No

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Ground Mount Notes

The solar panels are not allowed to be installed in the front 25-foot setback. If the panels cannot be relocated to the roof or rear yard, then a BZA Variance will be required to allow the panels to be 12’ from the front property line, instead of 25’.

In order to request an exception from any of the Zoning Code area requirements, a Board of Zoning Adjustment Variance is required, here is the link to the BZA application form: https://www.columbus.gov/WorkArea/DownloadAsset.aspx?id=69113The BZA process takes 2-3 months on average. $350

Setback Front Yard
25
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Columbus (OH) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.