City of Bedford (OH)
NEC Code Version2023
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2024 OHIO BUILDING CODE (2021 IBC)
2019 RESIDENTIAL CODE OF OHIO (2018 IRC)
2024 OHIO EXISTING BUILDING CODE (2021 IEBC)
2023 OHIO ELECTRIC CODE (2023 NFPA 70)
2021 INTERNATIONAL FIRE CODE (IFC)
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Not fewer than two 36โ wide pathways shall be provided along the sides of the panels and one 36โ pathway shall be provided along the bottom of the roof. An 18โ pathway is required along the ridge.
Structural & loads
- Wind Speed
- 90
- Snow Load
- 20
- Reducible Snow Load Allowed
- 1
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,PV Breaker,Load Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Elevation Detail Required
- No
Plan set
- Site
Cannot have any panels that face the street
- Roof Plan
Cannot have any panels that face the street
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim