NEC Code Version2023
Wet Stamps RequiredDigital Structural
Fire Setback Enforced0
Codes
- NEC Code Version
- 2023
- Code List
2025 NEW YORK STATE BUILDING CODE
2025 NEW YORK STATE RESIDENTIAL CODE
2025 NEW YORK STATE FIRE CODE
2025 NEW YORK STATE ENERGY CONSERVATION CODE
2025 NEW YORK STATE EXISTING BUILDING CODE
2025 NEW YORK STATE FUEL GAS CODE
2025 NEW YORK STATE MECHANICAL CODE
2025 NEW YORK STATE PLUMBING CODE
2025 NEW YORK STATE ENERGY STANDARD FOR SITES AND BUILDINGS EXCEPT LOW-RISE RESIDENTIAL BUILDINGS
2023 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 2
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 0
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 85
- Snow Load
- 999
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Allowed POI
- Line Side Taps,Load Side Taps,Meter Adapter,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
* System size cannot exceed 10KW.
* Designer MUST run PV watts report per mounting plane ( required)
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim