Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Village of Amityville (NY)

New York Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
Wet Stamps RequiredWet Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 NEW YORK STATE BUILDING CODE

2025 NEW YORK STATE RESIDENTIAL CODE

2025 NEW YORK STATE FIRE CODE

2025 NEW YORK STATE ENERGY CONSERVATION CODE

2025 NEW YORK STATE EXISTING BUILDING CODE

2025 NEW YORK STATE FUEL GAS CODE

2025 NEW YORK STATE MECHANICAL CODE

2025 NEW YORK STATE PLUMBING CODE

2025 NEW YORK STATE ENERGY STANDARD FOR SITES AND BUILDINGS EXCEPT LOW-RISE RESIDENTIAL BUILDINGS

2023 NATIONAL ELECTRICAL CODE

IEBC Accepted
1
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
4
Revision Required
0
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Wet Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1

Structural & loads

Wind Speed
124
Snow Load
30
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

(4) Sets of stamped plans required

Need PE stamp for Cover Solar App and Building Permit App.

Minimum Ground On Roof
#10

Electrical

AC Disconnect Required
No
Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,PV Breaker,Line Side Taps,Load Side Taps
Supply Tap Neutral Ground Bond Required
1
Temperature Rating
90
De Rating Ampacity
0.91
BOS Restrictions

Standard

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard ESS requirements

Separate ESS Disconnect Required
No
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

Standard

Cover Page

Standard

Site

All plans must provide building area calculations for existing and proposed/modified areas in square feet.

Roof Plan

Standard

Attachment Detail

Standard

Electrical Diagram

Standard

Label Page

Standard

Custom Placards Required
0

Ground mount

Ground Mount Fencing Required
No
Ground Mount Notes

Standard GM requirements

Setback Front Yard
10
Setback Back Yard
5
Setback Side Yard
5
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Village of Amityville (NY) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.