Town of Hempstead (NY)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 NEW YORK STATE BUILDING CODE
2025 NEW YORK STATE RESIDENTIAL CODE
2025 NEW YORK STATE FIRE CODE
2025 NEW YORK STATE ENERGY CONSERVATION CODE
2025 NEW YORK STATE EXISTING BUILDING CODE
2025 NEW YORK STATE FUEL GAS CODE
2025 NEW YORK STATE MECHANICAL CODE
2025 NEW YORK STATE PLUMBING CODE
2025 NEW YORK STATE ENERGY STANDARD FOR SITES AND BUILDINGS EXCEPT LOW-RISE RESIDENTIAL BUILDINGS
2023 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 1
- Revision Required
- 1
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 120
- Snow Load
- 25
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Stamps/Calcs required Additional PE documents required (blank forms can be found in the files section below): * **A stamped _ _Design Professional Certificate of Compliance__** * **A stamped _ _Permits Without Examination Form__** * _W_ hich needs to be on the Professional Engineer's letterhead and be worded as building dept has constructed. The letterhead needs to consist of more than just the name of the company placed on the top of the document. * Needs to include company info i.e. address, phone number, email address, website, etc. * Needs to be consistent and the company name not on the left top side on one and then middle or right top side on the next. * Only fill and sign the top half of the form, the bottom half of the form with the second signature line and notary portion will be filled out by the permit applicant. All revisions will require a resubmission letter signed and sealed by the PE detailing all changes made and the page numbers they occurred on.
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,PV Breaker,Meter Adapter,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Custom Placards Required
- 1
- Placards Notes
Meter placards are required for certain circumstances. They seem to be required when the BOS equipment is not near the meter and/or there are separate disconnects on detached structures.
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim