County of Lyon (NV)
Codes
- NEC Code Version
- 2017
- Fire Code Version
- 2018 Building Code
- Code List
2018 INTERNATIONAL BUILDING CODE
2018 INTERNATIONAL RESIDENTIAL CODE
2018 INTERNATIONAL EXISTING BUILDING CODE
2018 INTERNATIONAL ENERGY CONSERVATION CODE
2018 INTERNATIONAL FUEL GAS CODE
2018 INTERNATIONAL MECHANICAL CODE
2018 UNIFORM MECHANICAL CODE
2018 UNIFORM PLUMBING CODE
2017 NATIONAL ELECTRIC CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 1
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Ee Stamp Notes
Digitally Verified Signature required.
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Provide not fewer than 2 pathways from lowest roof edge to ridge on all roof planes with solar panels
Structural & loads
- Wind Speed
- 120
- Wind Notes
Exposure Category B
- MRI 25-Year -73mph
- MRI 50-Year -78mph
- MRI 100-Year -83mph
- Risk Category I -90mph
- Risk Category II -96mph
- Risk Category III -103mph
- Risk Category IV -107mph
ASCE 7-10
- MRI 10-Year -76mph
- MRI 25-Year -84mph
- MRI 50-Year -90mph
- MRI 100-Year -96mph
- Risk Category I -105mph
- Risk Category II -115mph
- Risk Category III-IV -120mph
ASCE 7-05 Wind Speed - 90mph
- Snow Load
- 30
- Snow Load Notes
The state of Nevada requires the minimum Ground load for the Northern NV area should be 30
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 72
- Structural Notes
Digitally Verified Signature required. The engineering calculations need to reflect a seismic category D2 zone.
- Minimum Ground On Roof
- #8
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,PV Breaker,Line Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
AHJ: City of Henderson (NV). Utility Co: NVEnergy - Nevada Energy. Battery needs to be installed in garage. [a past project. DCR 063020] Relocate battery meter socket & disconnect switch to the battery branch leg of the PV circuit with battery socket closest to the batt storage unit. There shall be no meter socket/disc switch at where the backup panel is located (AC coupled system). Batt > PM > Disco > Combiner
- Separate ESS Disconnect Required
- Local Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
See design criteria pdf below for snow load based on elevation
- Cover Page Notes
Ensure Seismic Zone and design criteria are on the cover.
- Electrical Diagram
Place AC disco visibly close to the MSP, Not on the other side of a fence **(per Cutright, Maxwell DCR 11/16/20)**
- Label Page
Ensure we publish NEC 2017 labels. 2020+ labels will be rejected
- Custom Placards Required
- 0
- Non Standard Revision Requirements
Any changes in valuation must be provided on response letter
Ground mount
- Ground Mount Fencing Required
- Yes
- Ground Mount Notes
This is less than 5 acres so the structure cannot be any closer to the road then the home.
Likely behind the home.
As long as the system is not over 15ft then the set back from the property lines is 5'ft
The following also needs to be adhered to.
8ft from the septic system
10ft from ANY other structure on the property.
Septic replacement area must be identified on plans
Always notate on plans:
Septic System
Distance to other structures
Distance to Septic System
Identify septic replacement area in equal size