County of Churchill (NV)
NEC Code Version2017
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1
Codes
- NEC Code Version
- 2017
- Fire Code Version
- 2018 Building Code
- Code List
2017 NATIONAL ELECTRIC CODE 2018 INTERNATIONAL BUILDING CODE 2018 INTERNATIONAL RESIDENTIAL CODE 2018 INTERNATIONAL FIRE CODE 2018 UNIFORM MECHANICAL CODE 2018 UNIFORM PLUMBING CODE 2018 INTERNATIONAL FUEL GAS CODE 2006 INTERNATIONAL PROPERTY MAINTENANCE CODE 2006 INTERNATIONAL PRIVATE SEWAGE DISPOSAL CODE 2018 INTERNATIONAL ENERGY CONSERVATION CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Wind Notes
- Include "Seismic Category = D1" within the Design Criteria on the Plans (where Snow & Wind speeds are listed).
- Seismic Category needs to be listed in both the Engineer's letter and Calculations.
- Exposure Category C
- Snow Load
- 30
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
PE calcs must call out seismic zone category D1
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,Load Side Taps,PV Breaker,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- No
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
All plans must include a page with the following information.
- Quality photos of the panel with the dead front removed
- A picture of the panel's rating sticker. (if a label is not present, then make note of this)
- An arrow indicating where you propose to place the PV breaker into the panel(s)
- Cover Page
Seismic category shall reflect: D1
- Electrical Diagram
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required