City of Sparks (NV)

Nevada Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2017
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredNone
Fire Setback Enforced1

Codes

NEC Code Version
2017
Fire Code Version
2018 Building Code
Code List

2018 INTERNATIONAL RESIDENTIAL CODE

2018 NO NV AMENDMENTS

2017 NATIONAL ELECTRIC CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
1
Revision Required
1
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
None
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
120
Wind Notes

Exposure Category B

Snow Load
30
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

PE Requirements; 2018 IBC (Structural only)


Structural calculations must include attachment spacing for standoffs

Must match plan set

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
All Jobs
Allowed POI
Meter Adapter,PV Breaker,Line Side Taps,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
No
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements
  • Include photos of existing service and any nameplates to justify load calcs
Roof Plan Notes

All Jobs [Conduit being installed 7/8" min above roof per 2017 NEC 310.15(B)(3) c]

Attachment Detail


Attachment Detail Notes

If using stronghold with butyl, ensure the embedment depth on the plans detail matches the autostamp calcs embedment depth.

engineering design requires 2.5" embedment, not 1.75"

-per 538075


Make sure lag/screw count in attachment diagram matches count in structural calcs.

Electrical Diagram

Load Calcs required for every project. Use City of Sparks Load Calc Template (Attached Below)

CE - Automated version available in Z:\CE Tools\References\Extra Tools <--- DOWNLOAD A COPY



All existing wiring callouts on the SLD must be tagged with the conductor size and type for example new subpanels

Label Page

Ensure we have NEC 2017 labels and not 2020+


Rapid Shutdown Label: The yellow version of this label denotes panels that are deactivated with rapid shutdown The red version of this label indicates conductors within the array are still energized after rapid shutdown is activated.

Custom Placards Required
0
Placards Notes

3x5, per code, permanent and v/ resistant.

Non Standard Revision Requirements

Do not add any red clouding to the plans prior to permit submission

Ground mount

Ground Mount Fencing Required
No