City of Reno (NV)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2024 INTERNATIONAL BUILDING CODE
2024 INTERNATIONAL RESIDENTIAL CODE
2024 INTERNATIONAL EXISTING BUILDING CODE
2024 INTERNATIONAL ENERGY CONSERVATION CODE
2024 INTERNATIONAL FUEL GAS CODE
2024 INTERNATIONAL MECHANICAL CODE
2024 UNIFORM PLUMBING CODE
2024 UNIFORM MECHANICAL CODE
2023 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 2
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Electrical,Digital Structural
- Structural Calculations Required
- Yes
- Ee Stamp Notes
Center-fed panels require EE stamp on SLD
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 120
- Wind Notes
Exposure Category C
- Snow Load
- 999
- Snow Load Notes
Double check elevation and snow load here: https://ascehazardtool.org/
Project West of Highway 95:
- Elevation 4500 - snow load 30
- Elevation 5000 - snow load 30
- Elevation 5100 - snow load 41
- Elevation 5200 - snow load 52
- Elevation 5300 - snow load 64
Project East of Highway 95:
- Elevation 4500 - snow load 30
- Elevation 5000 - snow load 30
- Elevation 5100 - snow load 31
- Elevation 5200 - snow load 33
- Elevation 5300 - snow load 34
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
- BATTERY PROJECTS REQUIRE CALCS OF MOUNTING ON WALL FOR ESS
- The seal must include the signature, expiration date and date which seal was signed
- Structural Engineer’s Stamp must be dated in accordance with the State of Nevada Engineer’s Board
- Ensure structural calcs DO NOT reference ASCE 7-10 on pages 4 and 5. Structural calcs need to cite ASCE 7-16
- Engineer to evaluate attachment requirements (lag screws) and specify minimum size and embedment
- PE calcs must provide calculations for the anchorage (lag screws)
- PE calcs must include seismic analysis
- Structural calculations and plans must be stamped by the same structural engineer. This includes revisions.
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- All Jobs
- Allowed POI
- PV Breaker,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
- BOS Restrictions
No taps allowed
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Powerwall weight on struc. calcs
Revise Engineer’s structural calculations to include assessing the exterior wall for the weight of the Powerwall 3 and specifying anchorage.
- Separate ESS Disconnect Required
- Local Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
ALL JOBS
- Provide manufacturer's span tables for attachment system
- Spec sheet required for panel upgrades
EV CHARGERS:
- Separate PV and EV charger plan sets required for this AHJ
- Cover Page
ALL JOBS
- Include wind speed and the snow load (PROJECT SPECIFIC)
- Include a total project cost <--- This information can be found in lightspeed
- The title block must include the contractor's license limit amount: $225,000
VICINITY MAP
- MUST be black and white line drawing. Follow steps below to generate this:
- Follow this link: https://snazzymaps.com/build-a-map
- 1. Style: Under "Style" click "choose a Snazzy maps style". Then type "lines" in the search bar that appears and select the first option. Then hit "apply style".
- 2. Size & Location: Click the pencil icon. Under "Center Location", click the green text that states "Or search for a location". Enter the site address. Click "apply changes".
- 3. Markers: click on "Add your first marker". Under "Location", click the green text that states "Or search for a location". Enter the site address and hit "apply changes".
- 4. Zoom in to the map until only the site and the nearest cross streets are showing. Take a snip of this image to use as the vicinity map. DO NOT use the save image feature from the website. Doing so will cause the site to ask the user to register for an account.
- Site
- Show Dimensions from the house to property lines. Label any accessory structures.
- Include street names on the site plan.
- Electrical Diagram
ALL JOBS
- Plans must include pictures of the MSP for all jobs. Be sure that this page is included in the table of contents.
- Include a red arrow on the pictures of the main service panel indicating where the PV breaker will be installed
EXISTING SYSTEMS
- Must combine POI for (N) and (E) system
- Custom Placards Required
- 0
- Placards Notes
Yes, per code with exposure to the sun.
- Non Standard Revision Requirements
- Do not rev cloud changes on plans if the permit has not been submitted yet. Rev clouds will still be needed for any revisions to the plans after the permit has been submitted for the first review.
- All changes to plans are required to be clouded with a Delta indicating the revision number and date the change was made.
- Revision letter must be detailed, cannot submit revision letters that only state "layout changed" or similar.
- A response letter, addressing all comments, must be submitted. The letter needs to list the hold comments and respond to the hold comments made by the building department.
- Only respond to the current hold comments made. Remove the 1st round of hold comments from the letter.
- If you are adding revision to the response letter, please add that under the response to the hold comments. Add a header of REVISION and list the revision under that.
- The letter must be submitted in PDF format.
- All other documents have been accepted. Do NOT upload again.
Ground mount
- Ground Mount Fencing Required
- Situational
- Ground Mount Notes
AHJ does not accept Nuance, Iron Ridge ONLY