City of Fernley (NV)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2024 INTERNATIONAL ENERGY CONSERVATION CODE
2024 INTERNATIONAL EXISTING BUILDING CODE
2024 INTERNATIONAL PROPERTY MAINTENANCE CODE
2024 INTERNATIONAL MECHANICAL CODE
2024 INTERNATIONAL PLUMBING CODE
2024 INTERNATIONAL FIRE CODE
2024 INTERNATIONAL FUEL GAS CODE
2024 INTERNATIONAL RESIDENTIAL CODE
2023 NATIONAL ELECTRICAL CODE
2024 UNIFORM MECHANICAL CODE
2024 UNIFORM PLUMBING CODE
2024 ACCESSIBILITY ANSI A117.1
2024 NORTHERN NEVADA AMENDMENTS BY NNICC
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Not accepted
- How Many Plansets Required
- 2
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Top Right
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category B Seismic Design Category D1
- Snow Load
- 20
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Only Structural Stamps needed
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,PV Breaker,Meter Adapter,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Complete the City of Fernley Checklist in files section and attach to plans
- Roof Plan Notes
All Jobs [Flashing is required to be installed in accordance with IRC Chapter 9 and/or IBC Chapter 15]
- Electrical Diagram
Standard
- Electrical Diagram Notes
All Jobs [A complete grounding electrode system shall include one of the electrodes specified in NEC 250.52(A)(4) through (A)(8) and shall be connected to the concrete-encased electrode (if present) in accordance with NEC 250.50. Refer to NEC 250.53 for installation of a supplemental electrode. Sizing of the grounding electrode conductor shall be in accordance with Table 250.66.]
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- No