City of Elko (NV)
Codes
- NEC Code Version
- 2017
- Fire Code Version
- 2018 Building Code
- Code List
2018 INTERNATIONAL BUILDING CODE WITH APPENDICES C, E, H, I, J AND O 2018 INTERNATIONAL RESIDENTIAL CODE WITH THE EXCEPTION OF CHAPTERS 11 THROUGH 42 BUT WITH APPENDICES H AND K AND Q 2018 INTERNATIONAL EXISTING BUILDING CODE 2018 INTERNATIONAL FIRE CODE 2018 INTERNATIONAL ENERGY CONSERVATION CODE 2018 UNIFORM MECHANICAL CODE 2018 UNIFORM PLUMBING CODE 2017 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 1
- Revision Required
- 1
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Wind Notes
3 second gust Exposure C
- Snow Load
- 30
- Snow Load Notes
Ground Snow Load and Roof Snow Load = 30 psf Frost Depth 30"
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
- PE calcs/letter should not reference ASCE 7-16 and NDS-18
- Stamped plans must be left unlocked for the AHJ to add their approval stamps
- Minimum Ground On Roof
- #10
Electrical
- Allowed POI
- Load Side Taps,Meter Adapter,Line Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Cover Page
* REMOVE staff SIGNATURE FROM ALL PAGES BEING STAMPED * Include APN on cover page. APN can be found by searching the site address here:
- Electrical Diagram
* Clearly specify the exact model number of the service panel you are going to install and provide manufacturer specification sheets for such service panelboard. * Line diagram to be drawn as how the actual service panel will look.
* Provide photos of the existing service panelboard and photos of its interior labels.
*If Feed-through lugs are present, must show the Existing subpanel on the line diagram including a Main Breaker Kit or an Existing Main Breaker.
*Provide photos of the existing subpanel showing it can either accept a main breaker and a new Main breaker kit will be installed or show that it already has a main breaker.
- Electrical Diagram Notes
All Jobs [all neutrals must be properly isolated from ground wires in the existing sub-panel]
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim