Village of Bosque Farms (NM)
NEC Code Version2020
Fire Setback Enforced0
Codes
- NEC Code Version
- 2020
- Code List
2020 NEW MEXICO ELECTRICAL CODE
2020 NATIONAL ELECTRICAL CODE
2012 NATIONAL ELECTRICAL SAFETY CODE
2021 NEW MEXICO BUILDING CODE
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL RESIDENTIAL CODE
2021 INTERNATIONAL EXISTING BUILDING CODE
2021 NM EARTHEN BUILDING CODE
2021 NM HISTORIC EARTHEN BUILDING CODE
2021 ENERGY CONSERVATION CODE
2021 UNIFORM MECHANICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Fire setbacks
- Fire Setback Enforced
- 0
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 999
- Snow Load
- 15
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Minimum Ground On Roof
- #10
Electrical
- Allowed POI
- Load Side Taps,PV Breaker,Meter Adapter,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim
- Setback Front Yard
- 30
- Setback Back Yard
- 10
- Setback Side Yard
- 10