Town of Plymouth (NH)
Codes
- NEC Code Version
- 2020
- Code List
2021 NH STATE BUILDING CODE
2021 NH STATE FIRE CODE
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL RESIDENTIAL CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL PLUMBING CODE
2018 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL EXISTING BUILDING CODE
2021 INTERNATIONAL SWIMMING POOL AND SPA CODE
2021 NFPA 1, FIRE CODE AS AMENDED BY SAF-FMO 300
2021 NFPA 101 LIFE SAFETY CODE AS AMENDED BY SAF-FMO 300
2020 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 0
- Setback Notes
- Standard
Structural & loads
- Wind Speed
- 85
- Snow Load
- 999
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
- Standard
- Minimum Ground On Roof
- #10
Electrical
- Allowed POI
- PV Breaker,Line Side Taps,Load Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
- Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Electrical Diagram
One-line drawings are required to show all components of the PV & battery system exactly as it will be wired by the electrician. Production meter & utility accessible disconnect equipment shall be noted “exterior utility accessible”. Production meter wiring terminations shall be noted “line to solar - load to utility”.
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim