Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Town of Acworth (NH)

New Hampshire Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2020

Codes

NEC Code Version
2020
Code List

2021 NH STATE BUILDING CODE

2021 NH STATE FIRE CODE

2021 INTERNATIONAL BUILDING CODE

2021 INTERNATIONAL RESIDENTIAL CODE

2021 INTERNATIONAL MECHANICAL CODE

2021 INTERNATIONAL PLUMBING CODE

2018 INTERNATIONAL ENERGY CONSERVATION CODE

2021 INTERNATIONAL EXISTING BUILDING CODE

2021 INTERNATIONAL SWIMMING POOL AND SPA CODE

2021 NFPA 1, FIRE CODE AS AMENDED BY SAF-FMO 300

2021 NFPA 101 LIFE SAFETY CODE AS AMENDED BY SAF-FMO 300

2020 NATIONAL ELECTRICAL CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

Revision Required
0
New Planset Required For Module Swap
0

Stamps

Structural Calculations Required
Yes

Structural & loads

Wind Speed
91
Snow Load
70
Reducible Snow Load Allowed
1
Minimum Ground On Roof
#10

Plan set

Custom Placards Required
0

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Town of Acworth (NH) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.