City of Concord (NH)

New Hampshire Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2020
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2020
Fire Code Version
2018 Building Code
Code List

2021 NH STATE BUILDING CODE

2021 NH STATE FIRE CODE

2021 INTERNATIONAL BUILDING CODE

2021 INTERNATIONAL RESIDENTIAL CODE

2021 INTERNATIONAL MECHANICAL CODE

2021 INTERNATIONAL PLUMBING CODE

2018 INTERNATIONAL ENERGY CONSERVATION CODE

2021 INTERNATIONAL EXISTING BUILDING CODE

2021 INTERNATIONAL SWIMMING POOL AND SPA CODE

2021 NFPA 1, FIRE CODE AS AMENDED BY SAF-FMO 300

2021 NFPA 101 LIFE SAFETY CODE AS AMENDED BY SAF-FMO 300

2020 NATIONAL ELECTRICAL CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
2
Revision Required
1
New Planset Required For Module Swap
0

Stamps

Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
115
Wind Notes

Exposure Category B

Snow Load
70
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Minimum Ground On Roof
#10

Electrical

AC Disconnect Required
Yes
Electrical Load Calcs Required
Derates
Allowed POI
PV Breaker,Load Side Taps,Line Side Taps,Meter Adapter
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Electrical Diagram

TAPS NOT ALLOWED

Custom Placards Required
0

Ground mount

Ground Mount Fencing Required
No
Ground Mount Notes

Setback requirements are on a case by case basis. Include dimensions to property lines based on proposed location of solar array. The required side or rear yard setbacks may be reduced to a minimum of five (5) feet for on-site consumption solar collection systems provided that the panels do not exceed nine (9) feet in height or two hundred fifty (250) square feet of solar land coverage encroachment into the setback, and are screened from adjacent properties

Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Concord (NH) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.