City of Trinity (NC)

North Carolina Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2017
Wet Stamps RequiredDigital Structural
Fire Setback Enforced0

Codes

NEC Code Version
2017
Code List
2018 NORTH CAROLINA BUILDING CODE 2018 NORTH CAROLINA RESIDENTIAL CODE 2018 NORTH CAROLINA PLUMBING CODE 2018 NORTH CAROLINA MECHANICAL CODE 2018 NORTH CAROLINA FUEL GAS CODE 2017 NATIONAL ELECTRICAL CODE
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

Revision Required
0
New Planset Required For Module Swap
0

Stamps

Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes - Multiple Layer Shingle,Yes - Roof Not Asphalt or Metal
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
0
Setback Notes
Standard

Structural & loads

Wind Speed
85
Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
48
Structural Notes
SE Stamps/Calcs required if: THe wieght of the PV System exceeds 3 pounds PSF The roof possesses more than 1 layer of asphalt shingles The roofing material consists of a type other than asphalt shingles or metal The roof is located in a 140MPH or greater wind zone
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
PV Breaker,Meter Adapter,Line Side Taps,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes
Standard
Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Ground mount

Ground Mount Fencing Required
Mesh/Scrim