Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Overland (MO)

Missouri Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2017
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2017
Fire Code Version
2018 Building Code
Code List

2018 INTERNATIONAL BUILDING CODE

2018 INTERNATIONAL RESIDENTIAL CODE

2018 INTERNATIONAL FIRE CODE

2018 INTERNATIONAL ENERGY CONSERVATION CODE

2018 INTERNATIONAL EXISTING BUILDING CODE

2018 INTERNATIONAL FUEL GAS CODE

2018 INTERNATIONAL MECHANICAL CODE

2018 INTERNATIONAL PLUMBING CODE

2017 NATIONAL ELECTRICAL CODE

IEBC Accepted
1
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

Revision Required
0
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Date Plans are Stamped

Fire setbacks

Fire Setback Enforced
1

Structural & loads

Wind Speed
115
Wind Notes

https://ascehazardtool.org/


Wind speed is 115mph or 89 with allowable stress design


Snow Load
20
Snow Load Notes

https://ascehazardtool.org/

Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Minimum Ground On Roof
#10

Electrical

AC Disconnect Required
No
Electrical Load Calcs Required
Derates
Allowed POI
Load Side Taps,PV Breaker,Meter Adapter,Line Side Taps
Supply Tap Neutral Ground Bond Required
1
Temperature Rating
90
De Rating Ampacity
0.91
BOS Restrictions

Standard

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard ESS Requirements

Separate ESS Disconnect Required
No
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements
  • Provide specs showing inverts are in accordance with UL 1741
  • Provide specs showing mods and racking are in accordance with UL 1703


Cover Page

Standard

Site


  • Note the names of street(s) that adjoin the lot, the lot number, and the subdivision name


Roof Plan
  • Dimension the roof length and width
  • Show the dimensions of the array(s). Add dimensions from edges of array(s) to roof edges and to other arrays


Attachment Detail

Standard

Electrical Diagram

Standard

Label Page

Standard

Ground mount

Ground Mount Fencing Required
No
Ground Mount Notes
  • Note the names of street(s) that adjoin the lot, the lot number, and the subdivision name
  • Label all existing features/structures on the lot including septic and wells.
  • Dimension an area free of brush that extends a minimum of 10ft from each side of the array
  • Show with arrows water run off direction(s) and show and label existing swales. The location (s) of the solar PV array system structure shall not obstruct swales or run-off
  • Show, label, and dimension pier locations and their on center spacing. Show and note pier and pier flare diameters and their required depth below grade


Setback Front Yard
10
Setback Back Yard
5
Setback Side Yard
5
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Overland (MO) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.