Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Town of Ogunquit (ME)

Maine Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2015 Building Code
Wet Stamps RequiredNone
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2015 Building Code
Code List

2015 INTERNATIONAL RESIDENTIAL CODE

2015 INTERNATIONAL BUILDING CODE

2015 INTERNATIONAL EXISTING BUILDING CODE

2015 INTERNATIONAL ENERGY CONSERVATION CODE

2015 INTERNATIONAL MECHANICAL CODE

2023 NATIONAL ELECTRICAL CODE

IEBC Accepted
1
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

Revision Required
0
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
None
Structural Calculations Required
No

Fire setbacks

Fire Setback Enforced
1

Structural & loads

Wind Speed
90
Snow Load
50
Reducible Snow Load Allowed
1
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Line Side Taps,PV Breaker,Load Side Taps,Meter Adapter
Temperature Rating
90
De Rating Ampacity
0.91
BOS Restrictions

Standard

Battery / ESS

Unique Battery Placards Needed
0
Separate ESS Disconnect Required
No
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

Standard

Cover Page

Standard

Site

Standard

Roof Plan

Standard

Attachment Detail

Standard

Electrical Diagram

Standard

Label Page

Standard

Custom Placards Required
0

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Setback Front Yard
5
Setback Back Yard
5
Setback Side Yard
5
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Town of Ogunquit (ME) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.