Town of Mechanic Falls (ME)
NEC Code Version2023
Wet Stamps RequiredDigital Structural
Codes
- NEC Code Version
- 2023
- Code List
MAINE UNIFORM BUILDING AND ENERGY CODE
2021 INTERNATIONAL RESIDENTIAL CODE
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL EXISTING BUILDING CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL MECHANICAL CODE
2023 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 1
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Date Plans are Stamped
Structural & loads
- Wind Speed
- 109
- Snow Load
- 80
- Reducible Snow Load Allowed
- 1
- Structural Notes
Required: Maine engineer stamp validating that the roof can handle the additional load , 2021 building code on calcs as well
- Minimum Ground On Roof
- #10
Plan set
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim