Town of Litchfield (ME)

Maine Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2015 Building Code
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2015 Building Code
Code List

MAINE UNIFORM BUILDING AND ENERGY CODE

2021 INTERNATIONAL RESIDENTIAL CODE

2021 INTERNATIONAL BUILDING CODE

2021 INTERNATIONAL EXISTING BUILDING CODE

2021 INTERNATIONAL ENERGY CONSERVATION CODE

2021 INTERNATIONAL MECHANICAL CODE

2023 NATIONAL ELECTRICAL CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

Revision Required
0
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Structural Calculations Required
No

Fire setbacks

Fire Setback Enforced
1

Structural & loads

Wind Speed
90
Snow Load
60
Reducible Snow Load Allowed
1
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Line Side Taps,PV Breaker,Load Side Taps,Meter Adapter
Panel Schedule Required
Partial Home Backup
Temperature Rating
90

Plan set

Custom Placards Required
0
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Town of Litchfield (ME) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.