Town of Lee (ME)

Maine Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

MAINE UNIFORM BUILDING AND ENERGY CODE

2021 INTERNATIONAL RESIDENTIAL CODE

2021 INTERNATIONAL BUILDING CODE

2021 INTERNATIONAL EXISTING BUILDING CODE

2021 INTERNATIONAL ENERGY CONSERVATION CODE

2021 INTERNATIONAL MECHANICAL CODE

2023 NATIONAL ELECTRICAL CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
1
Revision Required
0
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Ee Stamp Notes
No EE required
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Setback Notes

Standard

Structural & loads

Wind Speed
90
Snow Load
999
Reducible Snow Load Allowed
1
Structural Notes


Minimum Ground On Roof
#10

Electrical

Allowed POI
Meter Adapter,PV Breaker,Line Side Taps,Load Side Taps
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Plan set

Custom Placards Required
0

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Town of Lee (ME) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.