Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Village of Riverwoods (IL)

Illinois Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Electrical,Digital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2024 INTERNATIONAL BUILDING CODE

2024 INTERNATIONAL ENERGY CONSERVATION CODE

2024 INTERNATIONAL FIRE CODE

2024 INTERNATIONAL SOLAR ENERGY PROVISIONS AND ORDINANCE

2024 INTERNATIONAL RESIDENTIAL BUILDING CODE

2023 NATIONAL ELECTRICAL CODE

IEBC Accepted
1
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

Revision Required
0
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Digital Electrical,Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
N/A

Fire setbacks

Fire Setback Enforced
1

Structural & loads

Wind Speed
999
Wind Notes

ASCE TOOL

Snow Load
25
Snow Load Notes

ASCE TOOL

Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

STAMP ALL PAGES

  • PE to provide firm number on stamp
Minimum Ground On Roof
#10

Electrical

AC Disconnect Required
No
Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,PV Breaker,Line Side Taps,Load Side Taps
Supply Tap Neutral Ground Bond Required
1
Temperature Rating
90
De Rating Ampacity
0.91
BOS Restrictions

Standard

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes


Separate ESS Disconnect Required
No
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

Identify all conduit runs and junction boxes

Cover Page


Cover Page Notes

Need to put all corrections on the cover page when we receive revisions

All Jobs [HOME IS NOT EQUIPPED WITH FIRE SPRINKLERS // PROJECT FOLLOWS 2023 NEC & IRC 2024]

Site


Site Notes

All Jobs [HOME IS NOT EQUIPPED WITH FIRE SPRINKLERS // CONDUIT WILL BE RUN THROUGH ATTIC AS NEEDED]

Roof Plan


Roof Plan Notes

All Jobs [HOME IS NOT EQUIPPED WITH FIRE SPRINKLERS // CONDUIT WILL BE RUN THROUGH ATTIC AS NEEDED]

Attachment Detail


Electrical Diagram


Electrical Diagram Notes

All Jobs [Equipment listings and spec sheets attached to plans // PROJECT FOLLOWS 2023 NEC //  INSTALLER TO CONFIRM MAIN BREAKER OF EXISTING PANEL IS 22K AIC RATED. IF THIS IS NOT THE CASE, THE MAIN BREAKER TO BE REPLACED WITH NEW 200A, 22K AIC RATED BREAKER]

Battery [Relocated loads will need to be ARC FAULT PROTECTED]

Label Page


Label Page Notes

All Jobs [PROJECT FOLLOWS NEC 2023 & IRC 2024]

Custom Placards Required
0

Ground mount

Ground Mount Fencing Required
No
Ground Mount Notes

Standard Ground Mount requirements

Setback Front Yard
10
Setback Back Yard
5
Setback Side Yard
5
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Village of Riverwoods (IL) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.