Village of Orion (IL)

Illinois Authority Having Jurisdiction Solar permitting requirements

Spot something wrong?

These change with code cycles. If a requirement here is out of date or missing, tell us and we'll fix it.

Report a correction
NEC Code Version2014
Fire Code Version2015 Building Code
Wet Stamps RequiredDigital Structural
Fire Setback EnforcedYes

Codes

NEC Code Version
2014
Fire Code Version
2015 Building Code
Code List

2015 INTERNATIONAL BUILDING CODE

2015 INTERNATIONAL ENERGY CONSERVATION CODE

2015 INTERNATIONAL FIRE CODE

2015 INTERNATIONAL SOLAR ENERGY PROVISIONS AND ORDINANCE

2015 INTERNATIONAL RESIDENTIAL BUILDING CODE

2018 INTERNATIONAL ENERGY CONSERVATION CODE

2015 INTERNATIONAL SOLAR ENERGY PROVISIONS, AND ORDINANCE

2014 NATIONAL ELECTRICAL CODE

IEBC Accepted
Yes
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

Revision Required
No
New Planset Required For Module Swap
No

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Date Plans are Stamped

Fire setbacks

Fire Setback Enforced
Yes

Structural & loads

Wind Speed
90
Snow Load
20
Reducible Snow Load Allowed
Yes
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
PV Breaker,Line Side Taps,Meter Adapter,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
No
ESS Elevation Detail Required
No

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Setback Front Yard
10
Setback Back Yard
5
Setback Side Yard
5
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Village of Orion (IL) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.