Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Village of Milan (IL)

Illinois Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2011
Fire Code Version2015 Building Code
Fire Setback Enforced1

Codes

NEC Code Version
2011
Fire Code Version
2015 Building Code
Code List

2012 International Building Code

2012 International Existing Building Code

2012 International Resident Code

2012 International Mechanic Code

2012 International Fuel Gas Code

2012 International Fire Code

2012 International Property Maintenance Code

2012 International Energy Conservation Code

2012 International Plumbing Code, 2004 Illinois State Plumbing Code

2012 International Swimming Pool and Spa Code

2012 International Wildland - Interface Code

1997 Illinois Accessibility Code

2011 National Electric Code

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

Revision Required
0
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Structural Calculations Required
Yes - Multiple Layer Shingle

Fire setbacks

Fire Setback Enforced
1

Structural & loads

Wind Speed
90
Snow Load
20
Reducible Snow Load Allowed
1
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Line Side Taps,Meter Adapter,PV Breaker,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90

Plan set

Custom Placards Required
1
Placards Notes

CUSTOM SITE MAP PLACARDS REQUIRED FOR MID AMERICA

Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Village of Milan (IL) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.