Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Village of Maple Park (IL)

Illinois Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Wet Stamps RequiredDigital Structural
Fire Setback Enforced0

Codes

NEC Code Version
2023
Code List

2021 International Building Code

2021 International Residential Code for One-and Two-Family Dwellings

International Energy Conservation Code - Current Edition with State of Illinois Amendments.

2021 International Fire Code

2021 International Plumbing Code

2021 International Mechanical Code

2021 International Fuel Gas Code

2021 International Swimming Pool and Spa Code

2021 International Existing Building Code

2021 International Property Maintenance Code

2023 National Electrical Code

Illinois Plumbing Code - Current Edition

NFPA 101 Life Safety Code - Current Edition, as it applies to state buildings, state licensed facilities, and other occupancies under the purview of the OSFM.

Illinois Accessibility Code - Current Edition.

2010 ADA Standards for Accessible Design

Illinois Radon Resistant Construction Act - Current Edition.

Illinois Elevator Safety Act - Current Edition.

Illinois Smoke Detector Act - Current Edition.

Illinois Carbon Monoxide Alarm Detector Act - Current Edition.

Illinois Electric Vehicle Charging Act - Current Edition.

Illinois Urban Manual - Current Edition.

IEBC Accepted
1
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
1
Revision Required
0
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
0
Setback Notes

Standard

Structural & loads

Wind Speed
85
Snow Load
30
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

Standard

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Line Side Taps,Meter Adapter,Load Side Taps,PV Breaker
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

2006 IBC - 3 feet from ridge and sides

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Village of Maple Park (IL) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.