Village of Lakewood (IL)

Illinois Authority Having Jurisdiction Solar permitting requirements

Spot something wrong?

These change with code cycles. If a requirement here is out of date or missing, tell us and we'll fix it.

Report a correction
NEC Code Version2011
Wet Stamps RequiredDigital Structural
Fire Setback EnforcedYes

Codes

NEC Code Version
2011
Code List

2006 INTERNATIONAL BUILDING CODE (IBC)

2006 INTERNATIONAL RESIDENTIAL CODE (IRC)

2011 NATIONAL ELECTRICAL CODE (NEC)

2006 INTERNATIONAL MECHANICAL CODE (IMC)

2006 INTERNATIONAL FUEL GAS CODE (IFGC)

2012 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)

2006 INTERNATIONAL FIRE CODE

2000 NFPA LIFE SAFETY CODE

1997 ILLINOIS ACCESSIBILITY CODE (IAC)

2004 ILLINOIS PLUMBING CODE (IPC)

2003 INTERNATIONAL PROPERTY MAINTENANCE CODE

IEBC Accepted
Yes
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
3
Revision Required
No
New Planset Required For Module Swap
No

Stamps

Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
Yes
Setback Notes

06 IRC/IBC No fire setbacks. 3' Preferred

Structural & loads

Wind Speed
90
Wind Notes

Exposure Category B

Snow Load
30
Reducible Snow Load Allowed
Yes
Max Attachment Spacing
96
Structural Notes

Standard

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,Load Side Taps,PV Breaker,Line Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
No
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

AHJ Requires the Building elevations showing total height of structure with panels installed

Electrical Diagram

Standard

Custom Placards Required
No

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Village of Lakewood (IL) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.