Village of Hoffman Estates (IL)
NEC Code Version2020
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2021 INTERNATIONAL BUILDING CODE AND APPENDIX K
2021 INTERNATIONAL FIRE CODE
2021 PROPERTY MAINTENANCE CODE
2021 INTERNATIONAL RESIDENTIAL CODE APPENDIX C
2021 INTERNATIONAL MECHANICAL CODE
2020 NATIONAL ELECTRIC CODE
2021 INTERNATIONAL FUEL GAS CODE
2021 EXISTING BUILDING CODE
ILLINOIS PLUMBING CODE
ILLINOIS ENERGY CONSERVATION CODE
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 2
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category B
- Snow Load
- 30
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,Line Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 1
- BOS Restrictions
PV breaker not allowed in this AHJ, use non insulation piercing lug type connectors or connect through ConnectDER meter collar adapter.
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
PROVIDE PICTURE OF EXISITNG SERVICE MSP AND METER
- Electrical Diagram
PV BREAKER NOT ALLOWED
Piercing Taps not allowed
Utilize Burndy, POLARIS or Milbank lugs
- Electrical Diagram Notes
All Jobs [Pre-install meeting required with inspector prior to any work starting]
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim