Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Village of Carrier Mills (IL)

Illinois Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2014
Fire Code Version2015 Building Code
Wet Stamps RequiredNone
Fire Setback Enforced1

Codes

NEC Code Version
2014
Fire Code Version
2015 Building Code
Code List

2015 INTERNATIONAL BUILDING CODE

2015 INTERNATIONAL ENERGY CONSERVATION CODE

2015 INTERNATIONAL FIRE CODE

2015 INTERNATIONAL SOLAR ENERGY PROVISIONS AND ORDINANCE

2015 INTERNATIONAL RESIDENTIAL BUILDING CODE

2014 NATIONAL ELECTRICAL CODE

IEBC Accepted
1
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
2
Revision Required
0
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
None
Structural Calculations Required
No

Fire setbacks

Fire Setback Enforced
1

Structural & loads

Wind Speed
107
Wind Notes

https://ascehazardtool.org/

Snow Load
24
Snow Load Notes

https://ascehazardtool.org/

Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Minimum Ground On Roof
#10

Electrical

AC Disconnect Required
No
Electrical Load Calcs Required
Derates
Allowed POI
Load Side Taps,PV Breaker,Line Side Taps,Meter Adapter
Supply Tap Neutral Ground Bond Required
1
Temperature Rating
90
De Rating Ampacity
0.91
BOS Restrictions

Standard

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard ESS Requirements

Separate ESS Disconnect Required
No
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

CHECK LIST REQUIRED ----> CHECKLIST

Cover Page

Standard

Site

Standard

Roof Plan

ALL JOBS - Include the total number of attachments and the total weight of the PV system.

To calculate total weight, multiply the distributed weight * total array area:

EX) TOTAL ARRAY AREA: 588.54 SQ FT x SYSTEM DISTRIBUTED WEIGHT: 2.76 LBS = Total System Weight of 1624.37 LBS


To calculate number of attachments in a single row, divide the width of the row in inches by the attachment spacing. Round up and multiply by two. Do this for each row of modules and add them all up.

Attachment Detail

Standard

Electrical Diagram

Standard

Label Page

Standard

Custom Placards Required
0

Ground mount

Ground Mount Fencing Required
No
Ground Mount Notes

Standard Ground Mount requirements

Setback Front Yard
10
Setback Back Yard
5
Setback Side Yard
5
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Village of Carrier Mills (IL) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.