Town of Albany (IL)

Illinois Authority Having Jurisdiction Solar permitting requirements

Spot something wrong?

These change with code cycles. If a requirement here is out of date or missing, tell us and we'll fix it.

Report a correction
NEC Code Version2017
Fire Setback EnforcedNo

Codes

NEC Code Version
2017
Code List
SPS 320-325 WISCONSIN UNIFORM DWELLING CODE 2015 INTERNATIONAL BUILDING CODE SPS 361-366 WISCONSIN COMMERCIAL BUILDING CODE 2012 NFPA 1, FIRE CODE 2017 NATIONAL ELECTRICAL CODE SPS 316 WISCONSIN ELECTRICAL CODE
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
1
Revision Required
No
New Planset Required For Module Swap
No

Fire setbacks

Fire Setback Enforced
No
Setback Notes
Standard

Structural & loads

Wind Speed
115
Wind Notes

Exposure Category B

Snow Load
40
Reducible Snow Load Allowed
Yes
Max Attachment Spacing
96
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Line Side Taps,Load Side Taps,PV Breaker,Meter Adapter
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
No
ESS Notes
Standard
Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Ground Mount Notes
Allowed - may require additional zoning review by Green County (WI) Zoning and Land Use.
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Town of Albany (IL) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.