City of Quincy (IL)
Codes
- NEC Code Version
- 2017
- Fire Code Version
- 2018 Building Code
- Code List
2018 INTERNATIONAL BUILDING CODE
2018 INTERNATIONAL RESIDENTIAL CODE
2018 INTERNATIONAL PROPERTY MAINTENANCE CODE
2017 NATIONAL ELECTRICAL CODE
2018 INTERNATIONAL ENERGY CONSERVATION CODE
2018 INTERNATIONAL FIRE CODE IL STATE PLUMBING CODE IL ACCESSIBILITY CODE
2020 NFPA 855
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 1
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 1
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 100
- Snow Load
- 20
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Allowed POI
- Meter Adapter,Line Side Taps,Load Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
- BOS Restrictions
It appears they want a separate meter and MBE when doing the meter replacement instead of all in one.
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
ESS SYSTEM MUST BE LINESIDE PER ORDINANCE. PARTIAL BACKUP WILL NOT WORK IN THIS AHJ. ALL BATTERY BACKUP PROJECTS MUST BE LINE SIDE INTERCEPTING METER
(EXISITNG METER MAIN LEVER BYPASS OKAY IF NO LOADS IN MSP UPSTREAM OF MAIN BREAKER PROTECTED MID)
NON-BACKUP MUST BE LINE SIDE TAP
IF BATTERY IN GARAGE, PROVIDE HEAT DETECTOR AND BOLLARD AS NEEDED
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
UTILIZE CHECKLIST ON PROJECTS -------> CHECKLIST
- Electrical Diagram
MPU
- REQUIRE EMERGENCY DISCONNECT OUTSIDE NEC 230.85
- Electrical Diagram Notes
NON BACKUP BATTERY ADD NOTE:
BATTERY WILL SHUTDOWN DURING GRID OUTAGE
Battery [LOCATION OF BATTERIES SHALL NOT BE WITHIN 3FT OF EGRESS // AC DISCONNECT WILL ALSO ISOLATE ESS SYSTEM FROM GRID PER NFPA 855]
All Jobs [AC DISCONNECT WITHIN 10FT OF UTILITY METER]
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim
- Ground Mount Notes
Can not be in front yard
10' from house/existing structures
5' from sides
5' from back
No trench inspection- PICTURES ARE ACCEPTED
- Setback Back Yard
- 5
- Setback Side Yard
- 5