City of Peoria (IL)

Illinois Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2017
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2017
Fire Code Version
2018 Building Code
Code List

2018 INTERNATIONAL EXISTING BUILDING CODE

2018 INTERNATIONAL BUILDING CODE

2018 INTERNATIONAL RESIDENTIAL CODE

2018 INTERNATIONAL FIRE CODE

2018 INTERNATIONAL MECHANICAL CODE

2018 INTERNATIONAL FUEL GAS CODE

2018 INTERNATIONAL PROPERTY MAINTENANCE CODE

2017 NATIONAL ELECTRICAL CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
1
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
1

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Ridge Setback
3
Rake Setback
3
Hip Valley Setback
18
Eave Setback
0
Setback Notes

AHJ is VERY STRICT on fire setbacks. We can follow 2015 IBC with 3' on all rakes and ridges + 18'' on each hip and valley. Plans reviewer is a former fire fighter and declined to budge on this interpretation of the fire code.


When roof elevations (not planes) are not interconnected, the percentage of coverage shall be listed separately for each elevation. Please calculate percentage of coverage for each roof section separately when they are not interconnected. Example: Aurora Solar


AHJ IS VERY STRICT WITH SETBACKS. MUST MAKE SURE LAYOUT WILL 100% FIT AT TIME OF CONSTRUCTION REVIEW/DESIGN BEFORE MOVING FORWARD. ALL REVISIONS MUST BE SUBMITTED, MOD SWAPS NEED TO BE SUBMITTED IF PANEL COUNT/LAYOUT CHANGES. IF LAYOUT CHANGES AT INSTALL, WE MUST SUBMIT FOR APPROVAL BEFORE CONTINUING WITH INSTALL.


Pathways cannot have obstructions in the way, ex. chimney


systems located outdoors shall be separated by a

minimum 5 feet (1524 mm) from the following:

1. Lot lines.

2. Public ways.

3. Buildings.

4. Stored combustible materials.

5. Hazardous materials.

6. High-piled stock.

7. Other exposure hazards.

Structural & loads

Wind Speed
85
Wind Notes

90

Snow Load
27
Snow Load Notes

20

Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

Standard

Electrical

AC Disconnect Required
Yes
Electrical Load Calcs Required
Derates
Allowed POI
PV Breaker,Line Side Taps,Meter Adapter
Panel Schedule Required
Partial Home Backup
Supply Tap Neutral Ground Bond Required
1
Temperature Rating
90
De Rating Ampacity
0.91
BOS Restrictions
  • Taps installed on service conductors shall be marked ‘suitable for use on the line side of service equipment’ or equivalent
  • UL Listed (service rating) insulation piercing connectors are permitted.
  • No tap boxes
  • Remove ground from disconnect to POI for line side tap. provide bonding jumper in disconnect

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

ESS Location & Clearance Requirements

  • Position ESS at least 5' away from all property lines and lot lines
  • Maintain minimum 3' separation between ESS and all doors, windows, and openings
  • Verify ESS placement does not conflict with fire department setback requirements (reference applicable code sections such as 1204.2.1.2 for arrays covering 33% or more of roof area)
  • Prohibit ESS installation in basements unless the basement has an approved egress opening

ESS Documentation Requirements

  • Provide labeled elevation view(s) of ESS location showing spacing and separation from all doors, windows, property lines, structures, and other equipment as required by applicable codes
  • Include accurate elevation drawings showing all windows, openings, and distance measurements to ESS with minimum 3' clearance documented
  • Verify documentation matches photo evidence for opening locations
  • Interior battery installs must show smoke detector location/rating as well as the fire rating of the proposed room.
  • Ensure GIS-verified property line locations are accurately reflected in all ESS placement documentation
  • CALL OUT BOLLARDS IF SUBJECT TO VEHICLE DAMAGE
Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
Yes

Plan set

Plan Set Requirements


Site

Battery cannot be within 5' of property line. Please dimension AC Disconnect to the property line when it is not obvious at first glance.


Ticket #2865926 (ESS Location) ESS systems located outdoors shall be separated by a minimum 5 feet (1524 mm) from the following:

1. Lot lines.

2. Public ways.

3. Buildings.

4. Stored combustible materials.

5. Hazardous materials.

6. High-piled stock.

7. Other exposure hazards.

Roof Plan
  • Include roof area calculations. Only include roofs with modules in the roof area calcs.
Attachment Detail Notes
  • EXAMPLE PROJECTS: EXAMPLE 1
Electrical Diagram

Line Side Taps

  • Breaker tie in is preferred. Line side tap ONLY if necessary to avoid MPU.
  • Remove ground wire between disconnect and MSP
  • Bond the neutral in the AC solar disconnect when performing a line side tap installation (NOT in the main house panel)
  • Clearly show the neutral bonding location in the AC solar disconnect

ALL EGC MUST BE A MIN OF #8 STARTING FROM THE ROOF TO THE POI

SE batteries: POI needs to be listed as “feed through lug kit” in the MSP.

Custom Placards Required
0
Non Standard Revision Requirements
  • REVISION CLOUDS REQUIRED - CLOUD ALL CHANGES ON PLANSET

Ground mount

Ground Mount Fencing Required
No