City of Highwood (IL)
NEC Code Version2014
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced1
Codes
- NEC Code Version
- 2014
- Code List
2012 EDITION INTERNATIONAL BUILDING CODE
2012 EDITION INTERNATIONAL FIRE CODE
2012 EDITION INTERNATIONAL MECHANICAL CODE
2012 EDITION INTERNATIONAL FUEL GAS CODE
2012 EDITION INTERNATIONAL PROPERTY MAINTENANCE CODE
2012 EDITION INTERNATIONAL ENERGY CONSERVATION CODE
2012 EDITION INTERNATIONAL RESIDENTIAL CODE
2014 EDITION NATIONAL ELECTRICAL CODE ILLINOIS PLUMBING CODE, MOST CURRENT EDITION
1997 EDITION ILLINOIS ACCESSIBILITY CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 3
- Revision Required
- 0
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes - Battery
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
3' From Rake and 3 along the Ridge
Structural & loads
- Wind Speed
- 90
- Wind Notes
Exposure Category B
- Snow Load
- 30
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,Load Side Taps,Line Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Electrical Diagram
Standard
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim